A Highlight at the PMCC EPC-SUMMIT™ 2019 – Conflict Free Engineering

By |2018-12-20T15:55:30+08:00December 20th, 2018|EPC-SUMMIT™, Project Management|

A NOT SO PERFECT WORLD In most of the projects we have been involved in, it is typically the engineering and design phase which takes much longer than expected and some approvals come very late in the project, when construction is already ongoing. Also, the most costs occur due to rework which is caused by errors in the design or the issuing of wrong or outdated drawings during the construction phase. Good engineering management can help, but it still depends on correct and accurate design output. And it is very difficult to estimate and manage the risks coming out